Many states
(MadhyaPradesh) in India have implemented and more (Andhra, Bihar) are planning
to adopt Feeder Separation of electricity feeders at 33 and 11kV – the intent
being to provide separate feeders for residential and non-residential consumers
with a major focus on improving reliable power supply for residential consumers
and need-based power for non-residential consumers (majority agriculture). This
is also expected to better allow controls and monitoring, effective and
efficient use of available power (demand and supply side management) and
infrastructure and will also provide better transparency in terms of the impact
of subsidies and thereby enable fair tariff management.
The
implementation of this scheme involves physically duplicating infrastructure –
one for the residential feeders and one for non-residential feeders. This
requires additional poles and conductor to be installed resulting in increased
space for these expanded equipment. The project implementation also involves
few years of time.
In the
present context of Smart Grids, why would Indian Utilities T&D arms go for
this physical feeder separation route to achieve their intent is little
difficult to understand. Besides the difficulty in understanding, it also seems
a misspend of resources on an effort that can achieved more meaningfully,
effectively, efficiently and in a sustained manner through other means. Smart Grid offers that alternate approach.
The Smart
Grid concept, if implemented after due adaption to the intent, will allow
control and metering of individual sections of the network. Modifications will
be needed in the network to incorporate smart metering equipment, control
devices (circuit breakers. Switches, fuses) and provision of a new communication
network. The benefits of implementing the smart grid concept is the scalability,
ease of integration to other parts of
the network, ease of integration into other smart initiatives in the power
sector (including smart city), dynamic demand side and supply side management.
The implementation of the smart grid technology will take lesser time than the
feeder separation project. Besides the time, it would avoid use of additional
land space and return on investment would make it cost effective too. Thus,
Smart Grid technology, while ensuring that intent of feeder separation are met
will also lend additional benefits.
Agencies
considering the adoption of feeder separation project as a means to achieving
their intent may consider implementing an adapted version of Smart Grid
Technology as a worthy and better alternative. This will keep the network
‘Smart Ready’ for integration when Smart City concept becomes a reality in
every state in India.